Operational · Standard
PENDING-HUMAN-GRID-01
Cascading Power Grid Failure
A protection fault has split the eastern grid. Traffic signals, lifts, cooling centres, and Hospital B backup systems are degrading.
Mission thresholdUnder 5 fatalities
A 60-MINUTE CITY CRISIS CO-OP
After the first five-minute assessment, the city runs to a T+30 complication and the T+60 outcome. AI analyzes options; you make the final decision.
START HERE
First watch the crisis reach its no-action ending. Then rewind to T+5 and work with AI to change it.
LIVE CRISIS MISSIONS
PENDING-HUMAN-GRID-01
A protection fault has split the eastern grid. Traffic signals, lifts, cooling centres, and Hospital B backup systems are degrading.
PENDING-HUMAN-FLOOD-01
A river surge is entering South and Harbor. Low roads are closing while residents move toward three elevated shelters.
PENDING-HUMAN-EQ-02
A major earthquake has collapsed East Bridge, damaged the eastern grid, ignited structure fires, and overloaded Hospital B.